Any solar quote you get here will be grid-tie, hybrid or off-grid. Which one it is decides what happens during a brownout, what your extra power earns, and roughly how much you pay.
The three, side by side
| Grid-tie | Hybrid | Off-grid | |
|---|---|---|---|
| In a brownout | switches off, by design, to protect line workers | keeps your chosen circuits on from the battery | nothing changes; there is no grid |
| Daytime surplus | exported for the ₱10.63 credit under net metering | charges the battery first, then exports | stored, or wasted once the battery is full |
| Installed price | ₱35,000 to ₱55,000 per kWp | ₱43,000 to ₱79,000 per kWp | 3 kW ₱180,000 to ₱250,000; 10 kW ₱500,000 to ₱700,000 |
| Best for | a steady grid and working net metering | routine brownouts, or a long wait for net metering | no grid, or one too poor to rely on |
The grid-tie and hybrid prices are the 2026 ranges from our dataset. The off-grid prices are LakaSolar’s published ranges for systems with lithium batteries, and LakaSolar says the batteries make up 40% to 50% of the cost.
What each earns
Grid-tie costs the least per kWp and pays back fastest. A 5 kWp system at the typical ₱45,000 per kWp saves about ₱8,169 a month on a Meralco roof and pays for itself in about 2.3 years, as long as the net-metering meter is in. Until it is, the extra power earns nothing.
Hybrid earns the same from the panels, plus what the battery adds by saving daytime extra for the evening: ₱3.36 per kWh stored while net metering works, ₱14.00 while it doesn’t. What a battery earns has the details. In short, the battery pays back in five to eight years with net metering, and in under two without it.
Off-grid gets rid of the bill completely, but every kWh has to come from your own panels and battery, through a week of rain as well as a week of sun. So it has to be sized for the worst days, and the battery that gets you through them sits mostly idle the rest of the year. Off-grid makes sense where there’s no grid. It isn’t a way to beat Meralco.
What owners chose
- A hybrid-ready inverter doesn’t have to cost more. One buyer, fitting out an office and café, was quoted ₱550,000 for 20 kWp either way, grid-tie or hybrid without a battery. If your installer charges the same for both, take the hybrid-ready inverter and add a battery later.
- The battery is the expensive part. A 12 kW household was quoted ₱775,000 hybrid against ₱525,000 grid-tie.
- Grid-tie owners notice the brownouts. A Pampanga owner cut their bills by about three-quarters and still regretted having no backup.
- Off-grid works when it’s small. A holiday-house owner described a small off-grid setup that runs the lights, fans and phone charging and saves the minimum charge on a meter that would barely be used.
- Clouds set the ceiling. A Cebu owner of three years found cloudy days run lights, fans and the ref, not the aircon.
Which one is yours
- Meralco or another stable utility, net metering available: grid-tie, with a hybrid-ready inverter if it costs little or nothing extra.
- Brownouts most weeks, or a net-metering wait of months: hybrid, sized as in the battery guide.
- No grid, or an island line you can’t count on: off-grid, with enough battery for a day and a half to two days without sun, which is the margin LakaSolar recommends for the rainy season.
How to size each
- Grid-tie: from your bill, in the solar panel calculator.
- Hybrid: the same panels, plus a battery matched to your daily surplus or your brownout hours.
- Off-grid: start from what you use in a day, multiply by the number of rainy days you want to get through, and divide by 0.85 for losses. Then size the panels to refill that in one sunny day. The load table in what size power station a brownout needs gives the watts.
Sources
- https://www.meralco.com.ph/uploads/documents/11-2026-Residential-Bills-1.pdf?v=1794557170
- https://lakasolar.ph/news/off-grid-solar-system-philippines
- https://www.reddit.com/r/SolarPH/comments/1wcc3kh/help_me_finalize_my_solar_setup/
- https://www.reddit.com/r/SolarPH/comments/1v53l1h/13k_meralco_bill_ave_advice_on_solar_setup/
- https://www.reddit.com/r/Philippines/comments/hf03wx/