Where Solar Pays Back Fastest
The same rooftop system pays for itself in 2.1 years in Iloilo and 7.1 years in Lanao del Sur. The panels are the same. What changes from place to place is the rate you stop paying and how much sun you get. Here are all 131 distribution utilities, ranked.
Rates & prices last verified: 2026-10Download the full ranking as a CSV, with each utility's rate, export credit, sun hours, value per kWp and payback. You're welcome to use it if you credit us and link to this page.
| ILECO 3 Iloilo III Electric Cooperative, Inc. | Iloilo | ₱16.48 | 5.2 | ₱21,870 | 2.1 yr |
| FICELCO First Catanduanes Electric Cooperative, Inc. | Catanduanes | ₱18.13 | 4.64 | ₱21,804 | 2.1 yr |
| GUIMELCO Guimaras Electric Cooperative | Guimaras | ₱16.33 | 5.13 | ₱21,004 | 2.1 yr |
| ILECO 2 Iloilo II Electric Cooperative, Inc. | Iloilo | ₱15.85 | 5.2 | ₱20,960 | 2.1 yr |
| ILECO 1 Iloilo I Electric Cooperative, Inc. | Iloilo | ₱15.78 | 5.2 | ₱20,921 | 2.2 yr |
| BILECO Biliran Electric Cooperative, Inc. | Biliran | ₱18.93 | 4.39 | ₱20,637 | 2.2 yr |
| ANTECO Antique Electric Cooperative, Inc. | Antique | ₱15.98 | 5.21 | ₱20,391 | 2.2 yr |
| NOCECO Negros Occidental Electric Cooperative | Negros Occidental | ₱16.01 | 5.02 | ₱20,368 | 2.2 yr |
| MECO Mactan Electric Company Inc. | Cebu | ₱15.98 | 5.19 | ₱20,167 | 2.2 yr |
| CAPELCO Capiz Electric Cooperative, Inc. | Capiz | ₱15.78 | 4.87 | ₱19,993 | 2.3 yr |
| NEECO 2 - A2 Nueva Ecija 2 Electric Cooperative, Inc. - Area 2 | Nueva Ecija | ₱14.82 | 5.45 | ₱19,883 | 2.3 yr |
| VECO Visayan Electric Company, Inc. | Cebu | ₱14.89 | 5.19 | ₱19,452 | 2.3 yr |
| Meralco | Metro Manila, Bulacan, Cavite, Laguna, Rizal | ₱15.06 | 4.77 | ₱18,947 | 2.4 yr |
| NORSAMELCO Northern Samar Electric Cooperative, Inc. | Northern Samar | ₱15.87 | 4.74 | ₱18,919 | 2.4 yr |
| ORMECO Oriental Mindoro Electric Cooperative, Inc. | Oriental Mindoro | ₱15.35 | 4.68 | ₱18,862 | 2.4 yr |
| MORE MORE Electric and Power Corporation | Iloilo | ₱14.42 | 5.2 | ₱18,652 | 2.4 yr |
| SOLECO Southern Leyte Electric Cooperative, Inc. | Southern Leyte | ₱16.60 | 4.46 | ₱18,606 | 2.4 yr |
| TARELCO 1 Tarlac I Electric Cooperative Inc. | Tarlac | ₱13.32 | 5.47 | ₱18,486 | 2.4 yr |
| ABRECO Abra Electric Cooperative Inc. | Abra | ₱13.52 | 5.53 | ₱18,470 | 2.4 yr |
| ISECO Ilocos Sur Electric Cooperative, Inc. | Ilocos Sur | ₱13.23 | 5.56 | ₱18,431 | 2.4 yr |
| SAMELCO 1 Samar I Electric Cooperative, Inc. | Samar | ₱15.47 | 4.68 | ₱18,391 | 2.4 yr |
| NONECO Northern Negros Electric Cooperative | Negros Occidental | ₱15.74 | 4.6 | ₱18,345 | 2.5 yr |
| BISELCO Busuanga Island Electric Cooperative, Inc. | Palawan | ₱13.02 | 5.54 | ₱18,331 | 2.5 yr |
| NEPC Negros Electric and Power Corporation | Negros Occidental | ₱14.25 | 5.02 | ₱18,324 | 2.5 yr |
| PANELCO 1 Pangasinan I Electric Cooperative | Pangasinan | ₱12.55 | 5.66 | ₱18,242 | 2.5 yr |
| PANELCO 3 Pangasinan III Electric Cooperative | Pangasinan | ₱12.66 | 5.66 | ₱18,239 | 2.5 yr |
| CELCOR Cabanatuan Electric Corporation | Nueva Ecija | ₱13.07 | 5.45 | ₱18,112 | 2.5 yr |
| PALECO Palawan Electric Cooperative | Palawan | ₱12.86 | 5.54 | ₱18,058 | 2.5 yr |
| ZAMSURECO 2 Zamboanga del Sur II Electric Cooperative, Inc. | Zamboanga del Sur | ₱14.82 | 4.93 | ₱18,040 | 2.5 yr |
| Davao Light | Davao del Sur | ₱13.33 | 5.36 | ₱17,979 | 2.5 yr |
| LEYECO 3 Leyte III Electric Cooperative, Inc. | Leyte | ₱17.15 | 4.17 | ₱17,932 | 2.5 yr |
| LEYECO 4 Leyte IV Electric Cooperative, Inc. | Leyte | ₱16.97 | 4.17 | ₱17,866 | 2.5 yr |
| KAELCO Kalinga-Apayao Electric Cooperative | Kalinga | ₱14.84 | 4.84 | ₱17,810 | 2.5 yr |
| NORECO 1 Negros Oriental 1 Electric Cooperative, Inc. | Negros Oriental | ₱15.04 | 4.69 | ₱17,670 | 2.5 yr |
| CEBECO 2 Cebu II Electric Cooperative, Inc. | Cebu | ₱15.91 | 4.37 | ₱17,572 | 2.6 yr |
| LUELCO La Union Electric Cooperative, Inc. | La Union | ₱12.72 | 5.12 | ₱17,546 | 2.6 yr |
| SFELAPCO San Fernando Electric Light & Power Company | Pampanga | ₱13.12 | 5.35 | ₱17,464 | 2.6 yr |
| DORELCO Don Orestes Romualdez Electric Cooperative, Inc. | Leyte | ₱16.23 | 4.17 | ₱17,438 | 2.6 yr |
| SORECO 1 Sorsogon I Electric Cooperative, Inc. | Sorsogon | ₱15.49 | 4.6 | ₱17,422 | 2.6 yr |
| ZANECO Zamboanga del Norte Electric Cooperative, Inc. | Zamboanga del Norte | ₱14.18 | 4.83 | ₱17,415 | 2.6 yr |
| CELCO Camotes Electric Cooperative, Inc. | Cebu | ₱12.94 | 5.19 | ₱17,415 | 2.6 yr |
| SAMELCO 2 Samar II Electric Cooperative, Inc. | Samar | ₱14.77 | 4.68 | ₱17,377 | 2.6 yr |
| ESAMELCO Eastern Samar Electric Cooperative, Inc. | Eastern Samar | ₱14.86 | 4.67 | ₱17,377 | 2.6 yr |
| LEYECO 5 Leyte V Electric Cooperative, Inc. | Leyte | ₱16.38 | 4.17 | ₱17,256 | 2.6 yr |
| ZAMCELCO Zamboanga City Electric Cooperative, Inc. | Zamboanga del Sur | ₱13.47 | 4.93 | ₱17,228 | 2.6 yr |
| AKELCO Aklan Electric Cooperative, Inc. | Aklan | ₱15.15 | 4.61 | ₱17,179 | 2.6 yr |
| TARELCO 2 Tarlac II Electric Cooperative Inc. | Tarlac | ₱12.27 | 5.47 | ₱17,162 | 2.6 yr |
| CEBECO 3 Cebu III Electric Cooperative, Inc. | Cebu | ₱15.08 | 4.37 | ₱17,139 | 2.6 yr |
| AURELCO Aurora Electric Cooperative, Inc. | Aurora | ₱14.09 | 4.95 | ₱17,119 | 2.6 yr |
| DASURECO Davao del Sur Electric Cooperative | Davao del Sur | ₱12.00 | 5.55 | ₱17,107 | 2.6 yr |
| CENPELCO Central Pangasinan Electric Cooperative, Inc. | Pangasinan | ₱11.79 | 5.66 | ₱17,076 | 2.6 yr |
| ILPI Iligan Light & Power, Inc. | Lanao del Norte | ₱14.10 | 4.71 | ₱17,057 | 2.6 yr |
| CLPC Cotabato Light and Power Company | Maguindanao | ₱12.18 | 5.58 | ₱17,044 | 2.6 yr |
| OEDC Olongapo Electricity Distribution Company, Inc. | Zambales | ₱13.18 | 5.02 | ₱17,042 | 2.6 yr |
| NORECO 2 Negros Oriental 2 Electric Cooperative, Inc. | Negros Oriental | ₱14.35 | 4.69 | ₱17,016 | 2.6 yr |
| CEBECO 1 Cebu I Electric Cooperative, Inc. | Cebu | ₱15.24 | 4.37 | ₱16,913 | 2.7 yr |
| PROSIELCO Province of Siquijor Electric Cooperative | Siquijor | ₱12.87 | 5 | ₱16,878 | 2.7 yr |
| CAMELCO Camiguin Electric Cooperative | Camiguin | ₱14.90 | 4.58 | ₱16,834 | 2.7 yr |
| COTELCO Cotabato Electric Cooperative | Cotabato | ₱12.91 | 5.18 | ₱16,773 | 2.7 yr |
| FIBECO First Bukidnon Electric Cooperative, Inc | Bukidnon | ₱13.35 | 4.95 | ₱16,615 | 2.7 yr |
| PELCO 3 Pampanga III Electric Cooperative Inc. | Pampanga | ₱12.12 | 5.35 | ₱16,568 | 2.7 yr |
| TEI Tarlac Electric Inc. | Tarlac | ₱12.07 | 5.47 | ₱16,433 | 2.7 yr |
| ISELCO 1 Isabela I Electric Cooperative, Inc. | Isabela | ₱12.97 | 4.91 | ₱16,430 | 2.7 yr |
| COTELCO - PPALMA Cotabato Electric Cooperative, Inc. - PPALMA | Cotabato | ₱12.38 | 5.18 | ₱16,375 | 2.7 yr |
| TIELCO Tablas Island Electric Cooperative, Inc. | Romblon | ₱11.95 | 5.28 | ₱16,286 | 2.8 yr |
| MOPRECO Mountain Province Electric Cooperative Inc. | Mountain Province | ₱13.51 | 4.47 | ₱16,283 | 2.8 yr |
| NEECO 1 Nueva Ecija 1 Electric Cooperative Inc. | Nueva Ecija | ₱11.81 | 5.45 | ₱16,224 | 2.8 yr |
| ROMELCO Romblon Electric Cooperative, Inc. | Romblon | ₱11.94 | 5.28 | ₱16,213 | 2.8 yr |
| BATANELCO Batanes Electric Cooperative | Batanes | ₱12.72 | 5 | ₱16,150 | 2.8 yr |
| CASURECO 3 Camarines Sur III Electric Cooperative | Camarines Sur | ₱13.93 | 4.18 | ₱16,137 | 2.8 yr |
| AEC Angeles Electric Corporation | Pampanga | ₱11.84 | 5.35 | ₱16,111 | 2.8 yr |
| NEECO 2 - A1 Nueva Ecija 2 Electric Cooperative, Inc. - Area 1 | Nueva Ecija | ₱12.03 | 5.45 | ₱16,102 | 2.8 yr |
| SURSECO 2 Surigao del Sur II Electric Cooperative, Inc. | Surigao del Sur | ₱14.11 | 4.51 | ₱16,016 | 2.8 yr |
| ZAMECO 1 Zambales I Electric Cooperative Inc. | Zambales | ₱12.48 | 5.02 | ₱15,974 | 2.8 yr |
| PRESCO Pampanga Rural Electric Service Cooperative, Inc. | Pampanga | ₱11.94 | 5.35 | ₱15,966 | 2.8 yr |
| QUEZELCO 2 Quezon II Electric Cooperative | Quezon | ₱12.86 | 5.06 | ₱15,938 | 2.8 yr |
| BENECO Benguet Electric Cooperative | Benguet | ₱11.80 | 5.34 | ₱15,926 | 2.8 yr |
| TISELCO TICAO Island Electric Cooperative, Inc. | Masbate | ₱12.01 | 5.16 | ₱15,918 | 2.8 yr |
| OMECO Occidental Mindoro Electric Cooperative, Inc. | Occidental Mindoro | ₱12.55 | 4.95 | ₱15,905 | 2.8 yr |
| ZAMECO 2 Zambales II Electric Cooperative Inc. | Zambales | ₱12.48 | 5.02 | ₱15,887 | 2.8 yr |
| INEC Ilocos Norte Electric Cooperative, Inc. | Ilocos Norte | ₱11.14 | 5.6 | ₱15,844 | 2.8 yr |
| BLCI Bohol Light Company Inc. | Bohol | ₱13.32 | 4.7 | ₱15,822 | 2.8 yr |
| LUECO La Union Electric Company, Inc. | La Union | ₱12.35 | 5.12 | ₱15,804 | 2.8 yr |
| PELCO 1 Pampanga I Electric Cooperative Inc. | Pampanga | ₱11.77 | 5.35 | ₱15,748 | 2.9 yr |
| BASELCO Basilan Electric Cooperative | Basilan | ₱13.11 | 4.8 | ₱15,688 | 2.9 yr |
| MOELCI 1 Misamis Occidental I Electric Cooperative, Inc. | Misamis Occidental | ₱14.71 | 4.31 | ₱15,671 | 2.9 yr |
| QUEZELCO 1 Quezon I Electric Cooperative | Quezon | ₱12.02 | 5.06 | ₱15,625 | 2.9 yr |
| DORECO Davao Oriental Electric Cooperative, Inc. | Davao Oriental | ₱14.16 | 4.34 | ₱15,592 | 2.9 yr |
| LEYECO 2 Leyte II Electric Cooperative, Inc. | Leyte | ₱14.05 | 4.17 | ₱15,561 | 2.9 yr |
| MORESCO 1 Misamis Oriental I Rural Electric Cooperative, Inc. | Misamis Oriental | ₱12.80 | 4.76 | ₱15,510 | 2.9 yr |
| SOCOTECO 1 South Cotabato I Electric Cooperative, Inc. | South Cotabato | ₱13.21 | 4.74 | ₱15,410 | 2.9 yr |
| DECORP Dagupan Electric Corporation | Pangasinan | ₱10.96 | 5.66 | ₱15,367 | 2.9 yr |
| SORECO 2 Sorsogon II Electric Cooperative, Inc. | Sorsogon | ₱13.61 | 4.6 | ₱15,364 | 2.9 yr |
| SOCOTECO 2 South Cotabato II Electric Cooperative, Inc. | South Cotabato | ₱12.50 | 4.74 | ₱15,309 | 2.9 yr |
| BOHECO 2 Bohol 2 Electric Cooperative | Bohol | ₱12.98 | 4.7 | ₱15,273 | 2.9 yr |
| ASELCO Agusan del Sur Electric Cooperative, Inc. | Agusan del Sur | ₱12.62 | 4.73 | ₱15,182 | 3.0 yr |
| PENELCO Peninsula Electric Cooperative, Inc. | Bataan | ₱11.24 | 5.3 | ₱15,153 | 3.0 yr |
| IEC Ibaan Electric Corporation | Batangas | ₱12.82 | 4.81 | ₱15,024 | 3.0 yr |
| CEPALCO Cagayan Electric Power and Light Company, Inc | Misamis Oriental | ₱12.31 | 4.76 | ₱14,862 | 3.0 yr |
| MORESCO 2 Misamis Oriental II Rural Electric Cooperative, Inc. | Misamis Oriental | ₱12.35 | 4.76 | ₱14,717 | 3.1 yr |
| SURNECO Surigao del Norte Electric Cooperative | Surigao del Norte | ₱12.05 | 4.73 | ₱14,712 | 3.1 yr |
| PELCO 2 Pampanga II Electric Cooperative Inc. | Pampanga | ₱10.92 | 5.35 | ₱14,515 | 3.1 yr |
| MASELCO Masbate Electric Cooperative Inc. | Masbate | ₱10.67 | 5.16 | ₱14,502 | 3.1 yr |
| CAGELCO 2 Cagayan 2 Electric Cooperative, Inc. | Cagayan | ₱11.55 | 4.83 | ₱14,447 | 3.1 yr |
| CAGELCO 1 Cagayan 1 Electric Cooperative, Inc. | Cagayan | ₱11.89 | 4.83 | ₱14,438 | 3.1 yr |
| SAJELCO San Jose City Electric Cooperative | Nueva Ecija | ₱10.45 | 5.45 | ₱14,422 | 3.1 yr |
| MARELCO Marinduque Electric Cooperative, Inc | Marinduque | ₱12.10 | 4.62 | ₱14,377 | 3.1 yr |
| QUIRELCO Quirino Electric Cooperative, Inc. | Quirino | ₱12.26 | 4.69 | ₱14,191 | 3.2 yr |
| BANELCO Bantayan Electric Cooperative | Cebu | ₱12.23 | 4.37 | ₱14,062 | 3.2 yr |
| ALECO Albay Electric Cooperative, Inc. | Albay | ₱11.73 | 4.75 | ₱13,989 | 3.2 yr |
| BATELEC 1 Batangas I Electric Cooperative, Inc | Batangas | ₱11.34 | 4.81 | ₱13,975 | 3.2 yr |
| MOELCI 2 Misamis Occidental II Electric Cooperative, Inc. | Misamis Occidental | ₱12.83 | 4.31 | ₱13,927 | 3.2 yr |
| ANECO Agusan del Norte Electric Cooperative, Inc. | Agusan del Norte | ₱11.66 | 4.79 | ₱13,856 | 3.2 yr |
| BUSECO Bukidnon II Electric Cooperative, Inc. | Bukidnon | ₱10.75 | 4.95 | ₱13,795 | 3.3 yr |
| ISELCO 2 Isabela II Electric Cooperative, Inc. | Isabela | ₱11.30 | 4.91 | ₱13,632 | 3.3 yr |
| CASURECO 1 Camarines Sur I Electric Cooperative | Camarines Sur | ₱12.81 | 4.18 | ₱13,392 | 3.4 yr |
| LANECO Lanao del Norte Electric Cooperative, Inc. | Lanao del Norte | ₱11.40 | 4.71 | ₱13,370 | 3.4 yr |
| SURSECO 1 Surigao del Sur I Electric Cooperative, Inc. | Surigao del Sur | ₱12.04 | 4.51 | ₱13,353 | 3.4 yr |
| NUVELCO Nueva Vizcaya Electric Cooperative, Inc. | Nueva Vizcaya | ₱9.95 | 5 | ₱13,319 | 3.4 yr |
| BOHECO 1 Bohol 1 Electric Cooperative | Bohol | ₱11.12 | 4.7 | ₱13,131 | 3.4 yr |
| CANORECO Camarines Norte Electric Cooperative, Inc. | Camarines Norte | ₱11.21 | 4.71 | ₱13,079 | 3.4 yr |
| CASURECO 4 Camarines Sur IV Electric Cooperative | Camarines Sur | ₱12.25 | 4.18 | ₱12,673 | 3.6 yr |
| IFELCO Ifugao Electric Cooperative, Inc. | Ifugao | ₱10.25 | 4.91 | ₱12,248 | 3.7 yr |
| SIARELCO Siargao Electric Cooperative | Surigao del Norte | ₱10.52 | 4.73 | ₱12,046 | 3.7 yr |
| FLECO First Laguna Electric Cooperative, Inc. | Laguna | ₱9.68 | 4.92 | ₱12,042 | 3.7 yr |
| BATELEC 2 Batangas II Electric Cooperative, Inc | Batangas | ₱9.89 | 4.81 | ₱12,023 | 3.7 yr |
| DIELCO Dinagat Island Electric Cooperative, Inc. | Dinagat Islands | ₱9.56 | 4.73 | ₱12,021 | 3.7 yr |
| SUKELCO Sultan Kudarat Electric Cooperative, Inc. | Sultan Kudarat | ₱9.40 | 4.94 | ₱11,451 | 3.9 yr |
| CASURECO 2 Camarines Sur II Electric Cooperative | Camarines Sur | ₱10.31 | 4.18 | ₱10,897 | 4.1 yr |
| CEDC Clark Electric Distribution Corporation | Pampanga | ₱7.54 | 5.35 | ₱10,589 | 4.2 yr |
| LASURECO Lanao del Sur Electric Cooperative, Inc. | Lanao del Sur | ₱5.26 | 4.89 | ₱6,383 | 7.1 yr |
Reading the ranking
ILECO 3 tops it at 2.1 years on a ₱16.48 rate and 5.2 sun hours. One kWp of panels there avoids ₱21,870 of electricity a year. Meralco, which most readers are on, sits at 2.4 years and ₱18,947 per kWp.
At the other end, LASURECO takes 7.1 years, for a simple reason: its customers pay ₱5.26/kWh, the cheapest in the country, so there's less of a bill for solar to cut. That's a good position to be in, and the one place on this page where a slow payback isn't bad news.
The order isn't just the rate table sorted differently. Sun hours range from 4.17 to 5.66 a day across the country, a difference of roughly a third, which is enough to move a utility several places up or down. Pangasinan and Ilocos have a strong dry season and clear skies in March. Leyte and the Bicol provinces get the amihan, and lose sun for it in December and January.
Net metering changed this year
The power you export is only worth something once your utility connects you, and the rules for that were rewritten in April 2026. A distribution utility now gets 10 working days to decide on a complete application, down from 20, with no extensions. LGU electrical permits are limited to 3 working days. If an agency misses its deadline, the application is deemed granted.
The 100 kW personal-use cap set by RA 9513 (Renewable Energy Act of 2008) stayed the same, despite what some installer blogs say. Nationwide there were 17,175 users and 157 MW as of 2025-05. The whole process is explained in the net metering guide.
Frequently asked questions
Why does solar payback differ so much by location?
Two numbers decide it, and they don't move together. The rate you stop paying runs from ₱5.26 to ₱18.93 per kWh, and sun hours run from 4.17 to 5.66 a day. A high rate in a cloudy province and a low rate in a sunny one can end up in the same place, so the ranking isn't just the rate table in a different order.
Does a slow payback mean solar is a bad idea there?
No. It means your electricity is cheap, which isn't a bad thing. LASURECO customers pay ₱5.26/kWh, so there's less of a bill for solar to cut. Even at 7.1 years, the panels keep producing for about two decades after that.
What assumptions are in these numbers?
₱45,000 per kWp installed (the midpoint of the ₱35k to ₱55k range), 70% of production used in the house and the rest exported at each utility's own generation charge, which is what net metering credits (₱10.20 for Meralco), a 0.8 performance ratio, and each utility's own current rate and sun hours. Change any of them in the payback calculator.
How long does net metering approval take now?
Since the April 2026 reform, a distribution utility has 10 working days to decide, down from 20, and LGU electrical permits are limited to 3 working days. If the deadline passes, the application counts as approved. The 100 kW personal-use cap hasn't changed.
Where the numbers come from
The rates are the monthly figures from the rates tracker, each with its own source and month. Sun hours are Global Solar Atlas (Solargis) long-term satellite averages, taken at a geocoded point inside each utility's service area, and each utility's entry records that point with a link. Installed cost, export credit and performance ratio come from the shared dataset. It's all on the methodology page.
Use this ranking for planning, not as a quote. It takes one point to stand for each service area, and sunlight varies within a province. Which way your roof faces, how much shade it gets and how much power you actually use in the daytime will change your own number more than the gap between neighbouring rows here.